The facility is being developed on a speculative basis by Balmoral Park Ltd and will be available for occupation in Summer 2014. Developed to a high specification, the offices will incorporate large open plan floor plates with a double height reception area and generous car parking availability. The specificaiton includes: Air conditioning by VRV heat recovery system, a heat recovery mechanical ventilation system and an automatic energy efficient control system; Recessed energy efficient high frequency T5 modular lighting. Full movement sensitive and dalyight linked control system; 2.7m floor to ceiling height; 131 car parking The building is available in its entirety or may be let on a floor by floor or wing by wing basis.